Yep, the EPR design has had major constructability issues with every site (except the one in China, but there may be a lack of transparency with any issues/solutions that were done with them). EPR2 looks specifically to address the issues they've faced at Hinkley, Olkiluoto, and Flamanville ... we'll see how it turns out, hopefully it isn't just another example of throwing out one set of issues for a different set.

Most large construction projects suffer when there is too great a separation between design and construction. There needs to be feedback from one to the other, and when it takes 30 years to go from conceptual design to operational reactor, that feedback loop just isn't there. One big promise of SMRs is for components to be prefabricated - if you're building multiple of an object, the connection between design and construction will be much closer.